Thursday, April 3, 2008

ASM-L 3-D Align Install Rescheduled

Hi All

The 3-D align installation originally scheduled for the week of 4/7
through 4/11 and 4/14 through 4/18 has been rescheduled. The new
schedule is 4/14 through 4/18 and 4/21 through 4/25. Schedules have
been posted outside the lab and at the stepper. The stepper is up and
available for 4" wafer processing through next week.

Thanks.. Gary

No comments: