Friday, June 22, 2012

Partial Lab Shutdown, Saturday, 6/23/12

Dear labmembers --

The scrubber exhaust system requires unexpected maintenance. This will
take place from 7:30-2 pm tomorrow, Saturday, June 23. Most tools in
the lab require scrubber exhaust and so will not be available during
this time. Wet benches will be shutdown earlier, to allow for bath
draining in advance of the scrubber shutdown. The few tools remaining
that do not require scrubber exhaust will remain in operation (see list
below). Please also be aware that scrubber maintenance often results in
strong, unpleasant, sulfurous odors in the vicinity of this building -
you may want to avoid coming in. We deeply apologize for the
inconvenience this causes in your scheduling.

Your SNF Staff

Tools OK to run: Raith, sem4160, svgcoat, svgdev, exposure/align tools,
metal deposition tools.

--
Mary X. Tang, Ph.D.
Stanford Nanofabrication Facility
Paul G. Allen Room 136, Mail Code 4070
Stanford, CA 94305
(650)723-9980
mtang@stanford.edu
http://snf.stanford.edu

No comments: