Monday, February 25, 2008

Comment p5000etch SNF 2008-02-25 11:39:00: Ch C still down

I tried to run a process in Chamber C this morning. I got an error message "ChC detected RF fault while running step 1" and the RF power was reading 1010W when the set point was 100W. Chamber C is still down for RF generator.

No comments:

Post a Comment